For multi purchaser installation which incorporates industrial variety of premises such as Shops, Showrooms, Garages, Workshops, etc. where provision for relationship of further load might be needed, the assumed linked load of each and every spare/Area/circuit shall even be indicated inside the load distribution schedules submitted for DEWA's acceptance. Indicates http://dewa1881.org/