We would however include things like log siding on the outside gable finishes and dormers, a log stair-case and log posts and railings. Every single cabin kit wouldn't be pre-assembled, but would include 3 days manufacturing unit supervision with the jobsite. In around forty ), programs, as well as http://beauwslnf.dgbloggers.com/13615749/everything-about-log-cabins